Beverage Production Facility
Bang Energy Beverage Production Facility
Pembroke Pines, Florida
Markets: Refrigeration
Sub Markets: Beverage
Services: Delivery Methods
Size: 64,717 SF
Delivery Methods: Design-Build
The project included the renovation of an existing dry warehouse to accommodate the relocation of the owner’s existing 3oz high-speed energy drink shot line from a nearby existing facility. The building also houses new welfare spaces for production staff, new utilities and an internal utility room, new electrical service, an existing electrical service, raw material and packaging material storage, batching/mixing, flavor storage, trash dock and finished goods warehouse space to provide 242 floor double-stacked pallet positions. The project also included the upgrading of existing roof and envelope insulation through insulated metal panels, to adhere to upgraded energy code requirements.