Marine Corps Exchange Renovation

Location
Kaneohe Bay, HI
Project Size
65,000 SF
Completion Year
2022
Mxc Image Slider 2
42AD2430 A3A8 4D0B B43F 432F454978CD
D3AD9E02 E0E3 4FB5 BDBA BC8A74587610
27503EC1 77B0 4AC8 B153 DD1F4A90DFE9

As part of a multi-phase renovation effort, Stellar is leading the transformation of an existing distribution center into a modern storage and logistics hub to support the MCBH Exchange and Annex. Phase 1 includes the full deconstruction and removal of outdated racking, mezzanine structures, stairs, decking, lighting, and the existing fire sprinkler system. The team is redesigning the fire suppression and lighting systems to meet current code and accommodate a new warehouse racking layout. Additional scope includes structural modifications, installation of hydraulic surface-mounted dock levelers, and upgraded electrical systems to support expanded loading operations. Once complete, the facility will serve as the central storage and distribution point for the base’s retail operations, enhancing logistics efficiency and functionality.